Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.
1
/
of
12
KastKing
KastKing Kapstan Saltwater Spinning Rod | Boat & Surf Fishing Rod, Lightweight S-Curve Graphite, Stainless Double-Foot Guides,Aluminum Reel Seat, 2-Piece PTS
KastKing Kapstan Saltwater Spinning Rod | Boat & Surf Fishing Rod, Lightweight S-Curve Graphite, Stainless Double-Foot Guides,Aluminum Reel Seat, 2-Piece PTS
Regular price
$208.96 USD
Regular price
$208.96 USD
Sale price
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
About This
- Powerful S-Curve Graphite Blanks–Built for demanding saltwater fishing applications, KastKing Kapstan rods feature 100% graphite blanks with S-Curve construction and Nano-Resin technology for exceptional strength, lifting power, and lightweight responsiveness. The 2-piece PTS (Power Transition System) design delivers smooth power transfer and easy transport.
- Heavy-Duty Saltwater Guides – Reinforced stainless steel double-foot guides provide superior durability under heavy loads, while ultra-smooth Zirconium Oxide rings reduce friction and improve performance with braided and heavy saltwater lines.
- Boat & Surf Specific Reel Seats – Boat rods feature corrosion-resistant aluminum reel seats for maximum strength and stability when fighting large fish. Surf models use lightweight graphite reel seats for reduced weight and improved casting distance.
- Slip-Resistant Grip – Ergonomic handles provide lasting comfort and confident control during long fishing sessions. Durable rubber cross-wrap grips improve traction in wet conditions, while the spiral foregrip with finger grooves enhances leverage when fighting large fish. Split-grip boat rod handles improve maneuverability, while full-length surf rod grips maximize casting power and control.
- Versatile Saltwater Rod Series – Available in 7 models from 6'6" to 12', including boat and surf fishing rods designed for inshore, offshore, pier, and shoreline applications. Oversized hook keeper securely stores larger hooks and rigs during travel and storage.
Overview
- Brand : KastKing
- Material : Graphite
- Color : Blue
- Number of Pieces : 2
- Fishing Technique : Spinning
Share
